top of page
Search

Asbestos Abatement

  • info74222
  • May 8, 2015
  • 1 min read

Every owner of a building where asbestos abatement activity occurs is responsible for the performance of the asbestos abatement activities by his/her agent, contractor, employee, or other representative. Each building owner is responsible for determining the amount of asbestos-containing material that may be disturbed during the course of work.

The size and scope of the overall project, with particular reference to the total amount of asbestos-containing material that will be disturbed determines the reporting or filing requirements established in the Asbestos Control Program Rules. An asbestos project is defined as any form of work that will disturb more than 25 linear feet or more than 10 square feet of asbestos-containing material.

During the recent overhaul of operations we have renamed certain programs and now refer to them as A-TRU, Asbestos Technical Review Unit.


 
 
 

Recent Posts

See All
Asbestos removal

The first step in removing asbestos is to identify if it is present in the building. The next step is to start mitigation. The most...

 
 
 

© 2015 by Stylish Print Design Gallery Copyrights.

  • Facebook Clean
  • Google+ Clean
bottom of page